We have started building new windows for the project on Connecticut street. Three new openings have been made in the back of the building and we are in the process of constructing new windows to match the existing. These windows are being constructed to utilize sash spring bolts, these simple mechanisms simply hold the sash in place when the window is open. We chose this method so the sight lines of the frames match up to the existing windows.
top of page
bottom of page
Comments